New Project – M&E Commercial Fit-Out – Frimley

AES are pleased to announce that we have been successful with a tender to undertake an M&E Commercial  Fit-Out in Frimley.

The project is set to last 16 weeks and will include the following Mechanical & Electrical Services:

Mechanical Installation

A gas fired low pressure hot water heating installation will be provided to serve first floor office areas, toilets, main stairs, lobbies and circulation areas.

The gas fired combination boiler will provide hot water to the toilet areas with a mains cold water system provided to supply sanitary fittings. A mechanical extract ventilation system shall be provided to the toilet accommodation and heat recovery air handling units located within the ceiling voids

Electrical Installation

Office area lighting and power to provide 400 lux by recessed fluorescent luminaries suitable to provide a lighting design capable of achieving compliance withCIBSE LG7. Lighting control with PIR auto/on/off with photo-electric switching in the offices. PIR auto/on/off switching in WC areas with manual switching in circulation areas.

Emergency lighting systems shall be provided to the offices, toilets and circulation areas and to warehouse escape doors compatible with the requirements of BS 5266.

For more information regarding this project, please contact amember of our team by clicking here.

Leave a Comment